Boca Raton's bathrooms carry the city's build wave on their backs. About 56 percent of the homes counted in Census 2000 went up in the 1970s and 1980s alone, and nearly a third of all housing units sit in buildings of twenty units or more. Layer on the demographics — 24.6 percent of residents are 65 or older — and the Boca bathroom job sorts itself into three honest categories: a build-wave bath whose base has quietly expired, a pipe-era problem hiding behind good tile, and an accessibility conversion for the city's largest age group. Different jobs. Different prices. One page that treats them separately.
I'm Joe, with Onel Construction — our office is here, at 7100 W Camino Real. This is our home permit office and our home housing stock, and the bathroom version of Boca runs on specifics the kitchen page does not cover: pans, wet walls, and which plastic your house was plumbed with.

The First Conversation Is Not Tile. It Is the Pan.
Our own Boca record, stated in our permit writing and repeated here because it keeps proving true: a Boca West bathroom is very often working on an original shower pan, original valves, and original waterproofing now 35 to 45 years old. The villages were built from 1971 onward across 1,400 acres and 55 villages — townhomes, patio homes, villas, garden apartments, single-family houses — and the baths inside them were plumbed once, at construction, and in a great many units never touched again.
The City's own paperwork corroborates where these jobs fail. Among the forms on Boca Raton's Permit Application Forms page sits a "Failed Wet Wall Water Proofing Letter Template" — a template letter, kept on file, for when a wet wall's waterproofing fails. Cities do not keep templates for rare events. So the estimating sequence on a build-wave Boca bath is fixed: assess the pan, the valves, and what is under the floor first, then talk finishes. New tile over a failed base does not save the old base's money — it wastes the new tile's.
Which Pipe Era Is Your Bathroom?
Cast iron drains — before the mid-1970s. Cast iron was Florida's standard drain material until PVC took over around the mid-1970s — one South Florida account dates PVC becoming the local standard to 1972. Cast iron fails from the inside, including channel rot along the bottom of horizontal runs, on roughly a 50-year clock that Florida's moist, salt-influenced ground can shorten. Against Boca's Census 2000 distribution, the cast-iron-era share is about 29 percent of the stock — the 1960s layer and everything older. A conversion or a moved drain in one of those houses has to price the possibility that the drain, not the fixture, is the expired part.
Polybutylene supply — 1978 to 1995. The grey, blue, or black plastic often stamped PB2110 was installed in millions of American homes in exactly the years Boca was building fastest. It degrades from the inside out in chlorinated water; the class action over it settled in 1995 and its claims fund closed in 2009, so no fund pays for a repipe today; and Citizens, Florida's insurer of last resort, will not insure a house that has it. If your 1980s Boca bath still runs on it, a remodel that opens the walls is the moment to identify it — presence is verified per house at the measure, never assumed from the build year.
CPVC — the 1980s through early 2000s. The next era's plastic has a milder flaw: years of heat cycling, including attic runs, leave older CPVC brittle and prone to cracking at fittings when disturbed. Tying new fixtures into it is careful work, and a bathroom gut is often when a homeowner learns which plastic era their house belongs to. Three eras, three different jobs — which is why a Boca bath quote that never asks your build year has not really started.

The City's Permit Package Has a Bathroom Accent
Boca files a bathroom from its One & Two Family checklist menu — the interior alteration carries its own trade checklists, including "Plumbing Piping Fixtures" and a separate "Water Heater Changeout" — through Boca eHub, the City's online system for applying, paying, requesting inspections, and checking status. Building Permits and Inspections sits at 200 NW 2nd Avenue, 561-393-7930, hours 8 to 4 (Wednesdays to 3). The bath-specific forms tell the local story better than any brochure: the wet-wall waterproofing letter above, a "Walk-in Tubs and Water Heater Sizing" form, a "Water-Hammer Arrestor Installation" form, and an HOA Affidavit that builds the association's sign-off into the city package rather than leaving it as an afterthought.
Inspections run in enforced sequence — the City's FAQ is blunt that all inspections with a 10 sequence must be approved before the system allows a 20 sequence, and everything must be approved before the final. Then comes the step out-of-town contractors miss: a passed final does not close a Boca permit. The Admin Permit Closeout is a separate, internal step the permit holder schedules after the final is approved — schedule inspections three ways, through eHub, by phone at 561-393-7914, or by texting "Schedule" to 833-821-0601. And the first question is still jurisdictional: parts of west Boca, Boca Falls among them, are unincorporated Palm Beach County wearing a Boca mailing address, and those parcels permit through the County, not the City. We verify city-or-county per address before any permit promise is made.
The Accessible Bathroom Is a Boca Brief, Not a Niche
When one resident in four is over 65, the tub-to-shower conversion is not a specialty — it is Tuesday. Done properly, it is permitted plumbing work: the drain position changes, the threshold and pan are built for a low entry, waterproofing is rebuilt rather than patched, and the blocking for grab bars goes into the framing before tile, with a seat and valve placement planned for a seated user. We document and build this scope as an accessible shower — that is the term we use, in the contract and with the city. If a walk-in tub fits the household better, note that the City anticipates that too: its sizing form sits in the same permit package.
Our nearest completed scope of exactly this kind is documented and close: the master bathroom at 2888 Angler Drive in Delray Beach, five to eight miles north, rehabilitated for that city under Case #22-138 — tub out, accessible shower in as a $5,000 scope line, with a new vanity and sink, medicine cabinet, and light fixture bringing the master bath to $5,802, billed to the City of Delray Beach in our payment request of November 12, 2026. We label it Delray because it is Delray. It is also the honest evidence of how we build the conversion Boca asks for most.
In a Tower, Your Drain Is Your Neighbour's Ceiling
Nearly a third of Boca's housing sits in buildings of twenty or more units, and a unit bathroom answers to the building before it answers to the tile catalogue. Our condo record, from our own Boca writing: the association's alteration approval comes first — application, contractor licence and a certificate of insurance naming the association, scope and plans, and in some associations a refundable construction deposit. Boards set the calendar; some approve in a week, some meet monthly, and a monthly board can hold a good project six weeks on one meeting. Work hours compress to weekday windows. Materials and debris ride the padded service elevator on the building's schedule. And when plumbing is touched, the building schedules a water shutoff to the whole stack — your line, up and down — noticed to residents and done in a window, because your drain is your downstairs neighbour's ceiling.
Over the unit sits the building's own legal layer. Boca's Building Recertification Program, adopted August 24, 2021, requires recertification of condo and co-op buildings three stories or 50 feet and taller at 30 years old — or 25 years if within three miles of the coastline, which covers most of east Boca — on a repeating cycle, with the state's milestone inspections and Structural Integrity Reserve Studies (which expressly cover plumbing and electrical) running alongside. None of that adds a permit to your bathroom. What it changes is the board's patience for unapproved plumbing work — which is to say, it is one more reason the approval goes first, not after demo.
What Moves a Boca Bathroom Quote
The base. An original pan, valves, and waterproofing at 35 to 45 years old make the honest quote an assessed quote; finishes over a failed base waste the whole spend.
The drain era. A conversion over end-of-life cast iron in a pre-mid-1970s house is a drain job wearing a bath job's clothes; the same conversion over sound PVC in a 1980s house is not.
The supply era. Polybutylene present and degraded turns a fixture scope into a repipe conversation, with an insurance consequence if it is simply left; brittle CPVC is the milder version of the same driver.
Every drain that moves. Fixtures staying on their existing drains is the low end of Boca bath work. Conversions, relocated toilets, and added baths move drains and wet walls and reopen the waterproofing question in full.
The accessibility package. Threshold and pan construction, grab-bar blocking, seat, and valve placement — specified as its own scope, not bolted onto a standard shower.
The building. Stack shutoff windows, elevator bookings, restricted hours, alteration deposits, and common-area protection add calendar and administration to identical tile work.
Our Boca Bathroom Record, Without Decoration
No completed Onel bathroom in Boca Raton itself is on record, and this page will not manufacture one. The nearest completed bath scope is the Angler Drive master bathroom above — Delray Beach, labelled as such, billed to that city. Our current Boca kitchen file, the Sharrott estimate at The Shores, contains no bathroom scope at all beyond bringing GFCI protection to code, and we say so because the distinction matters: an estimate is not a job, and a kitchen is not a bathroom. What Boca homeowners get from us instead of a padded portfolio is the permit fluency of a contractor whose office is in this city — Onel Construction LLC is a licensed general contractor, CGC1511492 — and whose bathroom estimating starts where Boca bathrooms actually fail: underneath.
The Money Conversation in Boca Raton
Bathroom remodeling from $9,999 is our published starting anchor. Most Boca homeowners finance the bigger scopes rather than writing one cheque:
- Small refreshes can finance from $120/month with approved credit through Acorn.
- Typical full remodels land in the $200s–$300s/month range, with rates as low as 4.49% APR with approved credit.
- Tub-to-shower conversions, tile scope, and plumbing moves are what move the number.
Rated 5.0 stars from 24 Google reviews.
More Boca Work
- Kitchen Remodeling in Boca Raton — kitchens and baths in one project.
- Impact Windows & Doors in Boca Raton — harden the house while you're updating it.
- Hurricane Windows in Boca Raton — storm protection explained straight.
Boca Bathroom Questions, Answered Straight
Do I need a permit for a bathroom remodel in Boca Raton?
If the job moves a drain, relocates a fixture, converts a tub to a shower, changes wet-wall waterproofing, replaces a water heater, or touches electrical — yes, through the City, or the County if your Boca address is an unincorporated parcel. Swapping a vanity, mirror, and fixtures in place is the cosmetic side of the line. The City's forms tell the story: dedicated checklists for plumbing and water-heater changeouts, and a template letter for failed wet-wall waterproofing.
My Boca West bathroom is original to the house. Is the tile the problem?
Probably not the first one. In the 1970s and 80s villages, the documented pattern is an original shower pan, valves, and waterproofing now 35 to 45 years old under finishes that may still look presentable. The first conversation is the pan, the valves, and what sits under the floor — the written estimate names which situation your bathroom is in before you choose a finish.
How do I know if I have cast iron or polybutylene pipes?
By decade, as a first screen, then verified in person. Cast iron drains are the pre-mid-1970s standard; PVC follows. Polybutylene supply is the 1978-to-1995 risk — grey, blue, or black plastic, often stamped PB2110 — and Florida's insurer of last resort will not insure a home that has it. A remodel that opens the walls is the moment to identify which era your house carries; no honest contractor prices the plumbing scope before looking.
Can I convert my tub to an accessible shower?
Yes — it is one of the most common Boca briefs in a city where 24.6 percent of residents are 65 and over. Properly done it is permitted plumbing work: drain and threshold construction change, waterproofing is rebuilt, and seat and grab-bar blocking go into the wall framing. We document the scope as an accessible shower. If a walk-in tub is the better fit, the City keeps its own sizing form for one in the permit package.
I'm remodeling a condo bathroom. What does the building control?
More than most owners expect: the alteration approval before work starts, the work hours, the elevator for materials and debris, and the water shutoff to your whole stack — scheduled with management and noticed to your neighbours — whenever plumbing is touched. Separately, if your tower is 25 years or older within three miles of the coast, the building itself is on Boca's recertification cycle: context for the board's strictness, not an extra permit on your unit.
Why does my quote depend on what year my house was built?
Because the build year predicts the hidden systems: pre-mid-1970s means cast-iron-era drains, 1978 to 1995 means possible polybutylene supply, the 1980s to 2000s mean CPVC that can be brittle when disturbed — and across the 1970s–80s wave that built most of Boca, original pans and valves at end of life. Two identical-looking Boca bathrooms from different decades are genuinely different jobs underneath, and the decade tells an estimator where to look first.
Let's Look at Your Bathroom
Call or text (561) 462-9293 — or reach me through https://onelconstruction.com. Free in-home estimate. I'll tell you what it needs, what it'll cost, and whether you even need a full remodel or just the right fixes.
*Prices on this page are averages from recent jobs — I set them before the latest round of tariff-driven material increases, so treat them as ballparks, not quotes. Your free in-home estimate always uses current numbers. — Joe*
