Boca Raton is home base for us. Our office sits at 7100 West Camino Real, and the roofs over this city are the ones I see every day: barrel tile in the old Mizner streets, concrete tile across the country-club communities, and a generation of 1990s subdivisions whose original roofs are expiring together. The census sketches the audience: a median home value of $722,700, two-thirds of homes owner-occupied, a quarter of residents past 65. People here are not flipping. They are protecting the most expensive thing they own, and they read paperwork.
I’m Joe Pichardo, managing partner at Onel Construction. Fifteen years in the trades. This page is the Boca Raton roof talk, complete: the city’s own permit package, the approval that runs next to it, and the 1996 house in The Shores that is sitting on my desk right now as the most honest example of how these jobs actually go.
A Tile City, From Mizner Forward
Tile is not a style choice Boca adopted. It is the documented original condition. The National Register nomination for the Fred C. Aiken House in Old Floresta, one of 29 Addison Mizner houses built in that subdivision by the end of 1927, records the architectural style as Mediterranean Revival and the roof material as ceramic tile: hand-made terra cotta barrel tile, specifically. A century later the estate corridor still runs on that vocabulary, Royal Palm Yacht and Country Club has anchored it since 1959, and the concrete tile going on Boca roofs today, including the one specified on our current job in The Shores, is the direct descendant of those hand-made barrels. Any honest account of this city starts there: the signature roof is tile, the structure and the associations grew up around tile, and a reroof conversation that begins with a cheaper material has to explain itself.
How Boca Permits a Re-Roof
- The City issues it, through Boca eHub. Roof permits inside the city come from Development Services, Building Permits and Inspections, 200 Northwest 2nd Avenue, 561-393-7930, open weekdays 8 to 4, Wednesdays to 3. Boca eHub is the working portal: applications, plan status, inspection requests, invoices, and public records in one place. A Boca mailing address on county land is the exception to know about; those parcels permit through Palm Beach County instead.
- One- and two-family homes run on their own checklists. The City publishes two re-roof tracks, a standard Re-Roof checklist and an over-the-counter Re-Roof OTC track, and the checklist you file under decides the shape of the package.
- The supplemental package is Boca’s fingerprint. Alongside the application sit a Re-roof Mitigation Package, a Roof Re-nailing Secondary Water Barrier Affidavit, a Roof Supplemental Package with its Acknowledgment Memo, a Single Family Re-Roofing Affidavit, an HOA Affidavit, and a Windload Design Form. Read the names and you can see the job: deck attachment and a sealed barrier documented by affidavit, association sign-off built into the City’s own forms, wind design stated up front.
- Inspections run in sequence, not in a pile. The City’s rule is explicit: inspections in the 10 sequence must be approved before the system allows the 20 sequence, and everything required must clear before the final. If an inspection on the card looks unnecessary, you schedule it anyway and the inspector waives it in person. Scheduling runs three ways, through eHub, by phone at 561-393-7914, or by texting the word Schedule to 833-821-0601.
- A passed final does not close the permit. After the building final, the permit holder schedules the Admin Permit Closeout, an internal step nobody visits your house for, and the City’s position is that scheduling it is the permit holder’s responsibility. Jobs that skip it sit open on the record, which surfaces at resale. We schedule it. Every time.
Not the Hurricane Zone, and Not Exempt Either
The 2023 Florida Building Code defines the High-Velocity Hurricane Zone in one sentence: it consists of Broward and Miami-Dade counties. Boca Raton is outside it, and the paperwork follows. Products here are documented by Florida Product Approval under the state’s Rule 61G20-3, and the Miami-Dade Notice of Acceptance that Broward demands is not the governing document on this side of the line. The wind design still happens address by address: the code takes the speed from its map and the exposure category from your site’s actual conditions, which is why this page prints no single Boca wind number.
What Boca does not waive is the mitigation substance. A city outside the zone still makes your roofer swear out an affidavit covering deck re-nailing and a secondary water barrier, because a tear-off is the one affordable moment to fix how the roof is attached and sealed. Zone status changed the product paperwork. It did not change what a serious reroof includes.
The Neighborhoods Set the Roof
East Boca is the estate corridor: Old Floresta’s Mizner houses, Royal Palm’s deep-water streets between the Boca Raton resort and the Hillsboro River, the guard-gated Sanctuary. Large, cut-up, multi-plane roofs, extensive hip, ridge, and valley work, and materials decisions with a century of precedent looking over them. Boca West is a city inside the city: the club’s own account puts it at 1,400 acres, 55 residential villages, nearly 3,500 families, housing running from garden apartments and villas to single-family homes, where a roof over a multi-family building is an association’s project by structure, not by preference. West Boca’s subdivisions, The Shores and its neighbors, were built in the mid-1990s, which makes 2026 a particular year: those communities are turning thirty together, and original-era tile is reaching the end of its service in whole streets at once. That is not a metaphor. The house in the next section was built in 1996.
Two Approvals Before the First Tile Moves
Boca builds the association into the permit itself: an HOA Affidavit is one of the City’s own supplemental forms. Practical consequence, and it surprises people every season: your community’s architectural approval, tile color, profile, and manufacturer, is expected to exist alongside the city file, so the sequence that works is association approval and city permit advancing together, with the product on the permit matching the product the association approved. In club communities that review is standard practice and it runs before ordering, because a discontinued color discovered after the tile is loaded is an expensive education. There is a second possible layer. The City’s Community Appearance Board reviews aesthetic standards across Boca, staff decide during permit review whether a given permit needs the Board (a 2024 ordinance change let staff clear more permit types administratively), and the answer arrives with the review, not before it. Nobody honest promises you it will not be your permit.
Where a Boca Quote Gets Its Weight
| Driver | Why it moves your number |
|---|---|
| Profile and color matching | On any phased or partial tile work, matching the existing profile and color is the binding constraint, and on a full replacement the association’s approved list can rule out the cheapest tile on the shelf. |
| Estate rooflines | Multi-plane roofs with heavy hip, ridge, and valley counts price by complexity, not just by the square. The estate corridor’s roofs are the opposite of a simple gable rectangle. |
| What the attic is hiding | On 1990s stock, the expensive discovery is structural: truss damage and deteriorated sheathing that only show once tile and underlayment are off. Straight contractors price that work per unit as found, in the open, instead of burying a guess in the base number. |
| The City’s step count | Two checklists, a six-document supplemental package, sequenced inspections, and a closeout that has to be scheduled after the final. None of it is optional, and all of it is schedule. |
| Approval sequencing | Association review and a possible appearance-board referral run on their own clocks beside the permit clock. A quote that ignores them is quoting a job that cannot start when it says it will. |
| Condo calendar pressure | State reserve law has every three-story-plus association in the city carrying a dated, funded roof plan, and board projects compete for the same tile supply and the same contractor calendars as your house. |
Insurance: the Fifteen-Year Line
Florida drew a bright line in 2022, and Boca homeowners should know where it sits. An insurer may not refuse to issue or renew a policy solely because of a roof’s age when the roof is under fifteen years old. At fifteen years or older, the carrier still cannot refuse on age alone if a homeowner-paid inspection by an authorized inspector shows the roof has five or more years of useful life left. A permitted tear-off strengthens your file a second way: the re-nailing and secondary water barrier affidavit in the City’s package is a signed record of the two mitigation features a wind inspection looks for, generated by the job itself. No savings figure belongs in this section, because none can be promised. What can be said is that in a city of expensive houses, the roof is where your premium argument is won or lost, and documentation is the argument.
What a Straight Boca Quote Looks Like
- The tile lines are filled in. Manufacturer, color, and profile, named on the quote. On the live job described below, the paperwork that reached us left those three fields blank, and until they are settled the quote is a draft. Yours should not be.
- Unknowns are priced as unknowns. Replacement plywood and lumber carried as unit prices for what tear-off actually finds, stated in the document, rather than a base price that silently assumes a perfect deck.
- Payments follow inspection gates. Deposit, then a stage payment when the peel-and-stick barrier stage clears, then at tile delivery, with the balance on the approved final inspection. Money tied to municipal approvals cannot quietly run ahead of the work.
- The closeout is in the plan. The quote’s timeline ends with the building final and the Admin Permit Closeout scheduled, not with the last tile. An open permit is an unfinished job.
The Boca Job on Our Desk Right Now
Here is our Boca roof status, labeled exactly. In November 2026 we prepared and delivered a written estimate for a full concrete tile roof replacement at a 1996 home in The Shores, in west Boca. The job carries engineered truss repair: the homeowners’ engineer found split truss chords and moisture damage at the roof perimeter and prescribed sister reinforcements and sheathing replacement to happen during the reroof, so our estimate includes the truss work, the engineering, and the permits. The homeowners have the document and asked to meet in person. As of this writing there is no signed contract and no completed roof, and this page will not call it one. It is on this page because it is the truest picture of Boca roof work we can show you: a thirty-year-old tile roof, a structural surprise priced in the open, and a paperwork package with the tile fields still to be settled before anyone signs.
Our nearest completed roof is just north of the city line, in Delray Beach: 2888 Angler Drive, where the Roof Final passed on November 12, 2026, on a municipal job inspected stage by stage. Boca homeowners deserve both halves of that record, the finished one and the pending one, with the labels on straight.
Financing
A roof is a big ticket — I don't pretend otherwise. Through Acorn Finance: typical jobs in the $200s–$300s/month with approved credit, rates as low as 4.49% APR with approved credit. The roof goes on now, before the next storm season. The payments stay manageable.
Why Boca Calls Its Own GC
We are from here. Onel Construction’s office is in Boca Raton, our license work runs through Boca eHub weekly, and the associations your roof has to satisfy are the ones we file affidavits with. Local is not a slogan for us. It is a commute.
Onel Construction LLC is a licensed general contractor — CGC1511492.
Rated 5.0 stars from 24 Google reviews.
The estimate is a site visit, not a spreadsheet. Roof, deck edges, attic where it matters, then a written number for your house as it stands. On a Boca tile job, the difference between a measured quote and a modeled one is usually the truss nobody modeled.
Related Services
- Impact Windows in Boca Raton — the other half of this city’s hurricane file, usually reviewed in the same season as the roof.
- Hurricane Windows in Boca Raton — ratings, approvals, and what the associations ask for.
- Bathroom Remodeling in Boca Raton — the interior project most of our Boca homeowners pair with exterior work.
Boca Raton Roof Replacement FAQ
My tile profile was discontinued. Can a new roof still match my house, and my association’s approved look?
On a full replacement the matching problem changes shape: the whole roof becomes one new, Florida Product Approved tile system, so the question stops being whether new tile can imitate your old tile and becomes whether the new profile and color clear your association’s list. That settlement happens before the permit, alongside the City’s HOA Affidavit. Partial work is the harder case, and there the state’s 25 percent framework, and whether your existing roof was built under the 2007 code or later, decides how much of the roof the code makes you bring current.
Do I need HOA or club approval before the city permit?
Plan on the two advancing together. The City expects an HOA Affidavit inside its own re-roof package, which tells you the association piece is not an afterthought, and club architectural review of tile color and profile is standard practice in Boca’s communities. A limited number of permits also get routed to the Community Appearance Board, with staff making that call during review. Start the association first; it is usually the slower clock.
What are the actual permit and inspection steps for a Boca re-roof?
File through Boca eHub under the Re-Roof or Re-Roof OTC checklist, with the supplemental package behind it: mitigation package, re-nailing and secondary water barrier affidavit, supplemental acknowledgment, and the HOA and windload forms. Inspections then run in sequence, the 10s approved before the 20s open, everything cleared before the final, scheduled through eHub, by phone, or by text. After the building final passes, the permit holder schedules the Admin Permit Closeout. Skip that last step and the permit stays open on the City’s record.
Tile or shingle for a Boca house?
Tile is the city’s defining material, documented from Mizner’s hand-made barrels to the concrete tile specified on current jobs, and in club and association communities the approved-look rules often settle the question before price enters it. Shingle is a legitimate, code-compliant covering with its own Florida Product Approval, and there are Boca houses where it is the right call. But switching material or color is exactly the kind of change that wakes up association review and, on some permits, the appearance board, so the decision gets made with both approvals in view rather than at the material desk.
Will a new roof help with my homeowners insurance?
It changes your legal position first. Florida law bars a carrier from refusing you solely over roof age when the roof is under fifteen years old, and past fifteen it must accept an authorized inspection showing five or more years of remaining life instead of demanding replacement. A permitted Boca reroof also generates the affidavit trail for deck attachment and secondary water barrier that a wind mitigation inspection documents. What that is worth in premium is your carrier’s number to give, not ours.
How long does a tile re-roof take, and why are there inspections in the middle?
Because Boca’s inspections are sequenced, the job moves in stages: tear-off, deck work, the self-adhering barrier stage, tile load and set, final, closeout. The City will not open a later stage until the earlier one is approved, so the calendar is built from gates, not just crew days. Add association approval ahead of the permit and tile lead time ahead of the load, and any honest timeline is quoted in stages with the gates named.
Get On the Roof — My Eyes, Your Roof
Call or text (561) 462-9293 — or reach me through https://onelconstruction.com. Free in-home estimate. I'll inspect it, measure it, and give you a straight price — and an honest opinion on whether you even need a full replacement or just a repair.
*Prices on this page are averages from recent jobs — I set them before the latest round of tariff-driven material increases, so treat them as ballparks, not quotes. Your free in-home estimate always uses current numbers. — Joe*